Skip to content

Offers

We offer a full service. We will design, manufacture, install, modernize and maintain any lifting systems that you order from us.

We are the only company on the market that can offer the possibility to produce external shafts from prefabricated sheets. The advantage of this design is we can pre-prepare the materials in our factory with the possibility of embedding heating and electrical installations to ready-made elements.

Production lasts up to three weeks from the order, and the elements are assembled on site after prior preparation of the pit plate.

Installation, depending on the lifting height, takes up to 3 working days.

New installations

We provide full support right from the bidding stage, including appropriate selection of all parameters, flexibility, quick response times and cooperation with the best architects.

Modernizations

We specialize in the installation of new lifts in pre-existing buildings.

Construction works

We carry out all work related to the erection and reconstruction of lift shafts.

Project 1

  • 3 elements – extension of external shafts produced from prefabricated panels with pre-installed heating and electrical elements.
  • 3 weeks – this is the maximum production time.
  • 3 days – this is the maximum time for assembly.

Project 2

  • Extension of the external and internal shafts on a steel structure.
  • Sandwich-style panel housing.
  • Finishes – free choice of colors from the RAL palette.

Project 3

  • Extension of a transparent shaft made from tempered glass.
  • Laminated point fixing to the structure.

Project 4

  • Extension of a transparent shaft made from tempered glass.
  • Laminated fixing with a façade system.
  • Finishes – free choice of colors from the RAL palette.

Project 5

  • Extension of the external and internal shafts on a steel structure.
  • Finishing using reinforced plasterboard..
  • Finishes – free choice of colors from the RAL palette.

Implementation within 3 weeks

We wanted to meet market requirements and prepare for you an offer that meets the wildest expectations in our industry by creating a product available after 3 weeks from the order, which makes us a leader on the crane market.